Project management tool
PERT calculator
Enter optimistic, most likely and pessimistic estimates for an activity to get the PERT (beta) estimate, the triangular estimate, the standard deviation and the ranges you can expect the result to fall in.
| Measure | Formula | Result |
|---|---|---|
| PERT (beta) estimate | (O + 4M + P) ÷ 6 | 8 |
| Triangular estimate | (O + M + P) ÷ 3 | 9 |
| Standard deviation (σ) | (P − O) ÷ 6 | 2 |
| Variance | σ² | 4 |
| Range, ±1σ (≈68%) | beta ± 1 × σ | 6 – 10 |
| Range, ±2σ (≈95%) | beta ± 2 × σ | 4 – 12 |
| Range, ±3σ (≈99.7%) | beta ± 3 × σ | 2 – 14 |
The beta estimate weights the most likely value four times; the triangular estimate gives all three equal weight. Use the one the question names. The confidence ranges assume a roughly normal spread around the beta estimate.