Quality management, for the PMP exam, is the work of defining what quality each deliverable must reach, planning how the team will achieve and check it, and improving the way of working until it reliably does. It is Task 7 of the Process domain in PMI's Examination Content Outline, with seven enablers: gather quality requirements, plan quality processes and tools, execute a quality management plan, help ensure regulatory compliance, manage cost of quality and sustainability, conduct ongoing quality reviews, and implement continuous improvement. This lesson covers quality versus grade, quality metrics and tolerances, the quality management plan, manage quality versus control quality, the quality tools and control charts, regulatory compliance, the four categories of cost of quality, sustainability requirements, quality audits, built-in quality in agile delivery, and root cause analysis and PDCA in predictive, agile and hybrid projects.

What you’ll learn
  • Distinguish quality from grade, and precision from accuracy, and use the distinction to protect quality when cutting cost
  • Gather quality requirements early from users, regulators and standards, and turn them into measurable metrics with tolerances
  • Describe the quality management plan, execute it as approved and tailor one plan for hybrid delivery
  • Tell managing quality (process) from controlling quality (output) and choose the right quality tool for the question at hand
  • Read control charts: control versus specification limits, the rule of seven, stable but not capable, and tampering
  • Classify cost of quality into prevention, appraisal, internal failure and external failure, and treat compliance and sustainability criteria as quality requirements
  • Use audits, retrospectives, root cause analysis and small measured trials to improve quality during the project

What planning and optimizing quality means

Planning and optimizing quality means deciding, before the work is built, what good enough looks like for each deliverable, how the team will build that quality in, how it will be checked, and how the way of working will get better as the project goes on. Quality is not an inspection step at the end; it is a set of requirements, processes and habits that run from planning to handover.

The PMP Examination Content Outline lists seven enablers for this task, and this lesson follows them:

  1. Gather quality requirements for project deliverables: from users, the customer, regulators and organizational standards, turned into measurable metrics.
  2. Plan quality processes and tools: the quality management plan, and the analysis tools the team will use.
  3. Execute a quality management plan: do what the plan says, and change it only through the agreed route.
  4. Help ensure regulatory compliance: find the rules that apply early and build compliance and its evidence into the work.
  5. Manage cost of quality (CoQ) and sustainability: spend on quality where it pays back, and treat sustainability criteria as real quality requirements.
  6. Conduct ongoing quality reviews: audits, process analysis, inspections and reviews throughout delivery.
  7. Implement continuous improvement: root cause analysis, retrospectives and small, measured improvement trials.

Neighbouring tasks are kept separate. Formal acceptance of deliverables belongs to scope management, the mechanics of the change control process to integrated planning, and supplier selection to procurement. This lesson touches them only where they decide a quality question.

Quality versus grade, and precision versus accuracy

Quality is the degree to which a deliverable's characteristics meet its requirements; grade is the category or level of features a deliverable has. A basic product that meets every requirement with no defects is low grade but acceptable quality. A feature-rich product full of defects is high grade but low quality. Low grade can be a perfectly sound choice; low quality never is.

TermWhat it describesExample
QualityHow well the deliverable meets its requirements (conformance, fitness for use)An entry-level laptop that boots, runs and survives the agreed drop test every time
GradeThe category or feature level chosen for the deliverableAn entry-level rather than a flagship laptop model
PrecisionHow close repeated measurements are to each otherReadings tightly clustered, whether or not they are on target
AccuracyHow close a measurement is to the true or target valueReadings centred on the target value

The distinction matters most when money is tight. Grade is the lever that can be moved without breaking requirements: choosing a simpler specification, a smaller feature set or a less luxurious material, provided the cheaper option still satisfies every agreed requirement, including safety, durability and regulatory ones. Removing quality activities is a different kind of saving: it lowers quality, because nonconforming work is more likely to get through. Savings taken from risk reserves are not a grade decision either; they change the project's risk exposure and are handled as cost and risk decisions.

The words are often used loosely. When stakeholders describe a plain, fault-free deliverable as poor quality, the project manager uses the precise terms: the deliverable has a lower grade, and its quality is judged only against its requirements.

Gathering quality requirements and setting quality metrics

Quality requirements are gathered during planning, before design and build start, because design decisions depend on the standards the deliverable must meet. Any checkpoint later in the life cycle can only check work against requirements that already exist; a requirement first discovered at such a checkpoint means redesign or rework.

Sources of quality requirements go well beyond functional acceptance criteria:

  • Users and other stakeholders: elicit the expectations of every group that will use, operate or maintain the deliverable, not only the managers who sponsor it. Usability, reliability, performance, accessibility and operating conditions usually come from the people doing the work.
  • Regulations and laws: privacy, safety, health, financial and environmental rules that govern the deliverable.
  • Standards: industry and national standards (building codes, engineering standards) and the customer's own standards.
  • Organizational process assets: the performing organization's quality policy, procedures and templates.
  • Sustainability commitments: the organization's or customer's environmental targets that the deliverable must help meet.

Functional acceptance criteria describe what the product does; they rarely capture how well it must do it, or under what conditions. Material that describes how the team works internally, or what other products offer, is input at best; it does not define the quality this deliverable must reach.

When feedback reveals that a stakeholder group was overlooked, for example warehouse staff who will use a scanning app while wearing gloves in a freezer, the gap is in the requirements, not in a few reported symptoms. The project manager goes back and elicits that group's needs properly, then brings them in through the project's normal route: backlog refinement and reprioritization with the product owner on agile work, or a change request against the baseline on predictive work. Treating only the complaints raised so far, or noting the feedback without acting on it, leaves the underlying gap open.

Quality metrics and tolerances

A quality metric is a specific, measurable attribute of a deliverable or process, with a target and an agreed tolerance, that tells the team and the customer whether quality is being met. Vague expectations such as fast, reliable or easy to use cannot be tested, so the project manager works with the stakeholder to turn them into metrics before the team builds: for example, a response time with a target and tolerance, an availability percentage, or a defect density.

A good metric has three properties:

  • Measurable and verifiable: it has a number, a unit and a tolerance, so a review can say pass or fail. Wording such as minimal or as good as possible is an aspiration, not a target.
  • Tied to what the customer values: it measures the outcome the customer cares about, not how busy the team was or the form of the output. For an online booking form, the share of visitors who complete a booking says more about value than the number of form fields or how many test scripts were executed.
  • Checked at an agreed point: every release review, every inspection, or every build, as the quality management plan states.

The tolerance defines the acceptable range around the target. If a filled bottle must hold 500 ml plus or minus 5 ml, every bottle from 495 ml to 505 ml conforms, whether it holds 497 ml or 503 ml. Results inside the tolerance are conforming results: reworking them to hit the exact target is waste, and there is nothing to escalate or renegotiate. Action is needed only when results fall outside the tolerance, or when a trend suggests they soon will.

Metrics are recorded with the quality requirements and are used by both managing quality (are the processes producing work within tolerance?) and controlling quality (does this deliverable meet its metric?).

The quality management plan and executing it

The quality management plan is the component of the project management plan that describes how the project will meet its quality requirements: the standards that apply, quality objectives, roles and responsibilities for quality, the deliverables and processes subject to review, the quality control and quality management activities planned (reviews, audits, inspections, tests), the tools the team will use, and how nonconformance and improvement will be handled. Quality metrics are a related but separate output; they define what is measured, while the plan describes how quality is managed overall.

Executing the plan means doing the agreed quality activities even when they are inconvenient. Schedule pressure is the usual test: someone suggests dropping a planned check to recover time. Dropping it, making it optional, delegating the decision to one person, or swapping it for a different later check all change an approved plan. The project manager keeps the planned activity in place, and if the proposed change has merit, takes it through change control with its quality risk analysed, so the people with authority decide on the evidence.

Tailoring fits the plan to the delivery approach. A hybrid project, say a predictive building fit-out with an agile team developing its building-management software, still has one quality management plan, but that plan specifies different activities for each part: formal phase-gate inspections and sign-offs for the physical work, and a definition of done, automated tests and iteration reviews for the software. Applying one approach's controls to the whole project, in either direction, puts checks on work they were not designed for.

Because the plan is part of the approved project management plan, improvements to it, such as a new review step or checklist, are also taken through change control before they become the required way of working.

Manage quality versus control quality

Managing quality is about the process: making sure the way the team works will produce conforming deliverables. Controlling quality is about the output: inspecting and testing finished work against its requirements. The first prevents defects; the second finds them.

Manage qualityControl quality
FocusThe processes that produce deliverablesThe deliverables themselves
Question it answersWill our way of working produce compliant results?Does this deliverable meet its requirements?
Typical activitiesQuality audits, process analysis, design for quality, root cause analysis, sharing good practicesInspections, testing against acceptance criteria and metrics, measurements, check sheets, control charts
Main outputsProcess improvements, change requests, updated plans, lessons learnedVerified deliverables, quality control measurements, defects to repair

Manage quality is often loosely called quality assurance, but the PMBOK Guide treats it as broader than assurance: it also covers designing quality into the product and improving the processes themselves.

The signal to move from controlling output to managing the process is a pattern. One defect is a control-quality event: repair it. The same kind of defect appearing again and again tells you the process keeps creating it, and finding it more efficiently changes nothing about why it occurs. The response moves upstream, in two steps:

  • Is the process being followed? A quality audit answers that. If people are not following the agreed process, restoring it is the fix.
  • If it is being followed and the defect still occurs, the process itself is the problem. More training on the same process, repeating the audit or adding checks at the end will not change the result. Process analysis examines the steps of the process to find where the defect is introduced and which step to redesign.

Controlled deliverables still need the customer's formal acceptance; that step belongs to scope management. Quality control verifies correctness for the team before the customer validates.

Quality tools and control charts

Each quality tool answers a different question, so the right tool depends on what the team needs to know at that moment. The commonly tested ones are:

ToolUse it when you need to…Not to be confused with
Check sheet (tally sheet)Collect data consistently as defects or events occur, by typePareto chart, which analyses data already collected
Pareto chartRank many categories by frequency to find the vital few that cause most problems (the 80/20 idea)Cause-and-effect diagram, which explores causes of one problem
HistogramShow the distribution of one variableScatter diagram, which relates two variables
Scatter diagramSee whether two paired measurements are related (for example, oven temperature and loaf weight)Histogram, which shows only one variable
Cause-and-effect (fishbone, Ishikawa) diagramBrainstorm possible causes of one chosen problem across categories such as people, process, tools and environmentFive whys, which drills into one chain of causes
Five whysTrace one specific failure step by step to a process cause the team can changeCause-and-effect diagram, which explores causes in breadth
Control chartTell whether a process is stable over time and when it needs investigatingSpecification limits, which come from the customer and judge individual units; and run charts, which show trends without control limits

The tools often follow one another. Data is gathered on a check sheet; a Pareto chart built from it shows which category matters most; the causes of that category are explored with a cause-and-effect diagram or a five whys analysis; and a scatter diagram can test whether a suspected cause really moves with the effect. Most tool questions turn on which step of that chain the team is at.

Reading control charts

A control chart plots measurements of a process over time against a mean and upper and lower control limits, which are calculated from the process's own data (typically three standard deviations either side of the mean). It shows whether the process is in control, meaning its variation is only the normal, random common-cause variation, or whether a special (assignable) cause has appeared.

Control limits are not specification limits. Specification limits come from the customer's requirements and decide whether a unit is acceptable. Control limits describe what the process normally does. They answer different questions:

SituationWhat it meansResponse
A point outside a control limitThe process is out of control, even if the unit is within specificationInvestigate for an assignable cause; the unit itself may be acceptable
Seven consecutive points on one side of the mean (rule of seven)A non-random run: the process has probably shifted, even though every point is inside the limitsInvestigate for an assignable cause
Random points inside the limits, but the limits are wider than the specificationStable but not capable: the process routinely produces some out-of-specification unitsImprove the process to reduce its overall variation
Random points inside the limits and within specificationStable and capableLeave the process alone and keep monitoring

Other run patterns, such as a steady upward or downward trend, can also suggest a special cause, and many organizations use them as extra heuristics; the rule of seven is the one most often named.

Tampering is adjusting a stable process in reaction to individual results that are only common-cause variation. Because each adjustment responds to noise, it adds variation instead of removing it. The opposite error is changing the yardstick: moving or recalculating limits so that a signal disappears, or asking for the requirement to be relaxed, hides the problem rather than finding its cause. Control limits are recalculated only after a real, deliberate change to the process.

Regulatory compliance as a quality requirement

Regulatory compliance means the deliverable, and the way it was produced, meets the laws, regulations and mandatory standards that apply to it. The project manager's job is to make sure the applicable rules are identified early, built into requirements and the way of working, and proven with evidence.

  • Identify the rules first. When the team is unsure which regulations apply, for example whether an accessibility law or a financial reporting rule covers a new system, the first step is to bring in compliance or legal experts to identify them. Regulations often shape architecture, data handling and design from the start, so deferring the question to a late review, or proceeding on assumptions, builds in rework. Business roles such as the sponsor or product owner set priorities; they are not the authority on what the law requires.
  • Build compliance in, not on. On agile work, compliance checks that apply to every item belong in the definition of done, so each increment is checked as it is built. Patterns that batch the verification late, or add a separate approval queue for every item, either find gaps when they are expensive to fix or create bottlenecks without improving the work.
  • Keep the evidence. Many regulators require documented proof that work was performed and reviewed, not just that it was done. Evidence is created as the work happens: each inspection, test or review is recorded and signed off at the time. Evidence cannot be credibly reconstructed afterwards, so the fix for a missing record trail is to start producing records contemporaneously and to agree with the compliance experts how to treat the gap.

Compliance requirements are fixed constraints, so changing them is not a project decision. When a requirement is genuinely in question, the project manager escalates to the people with authority rather than reinterpreting it.

Cost of quality and sustainability

Cost of quality (CoQ) is the total cost of all effort related to quality across the life of a deliverable: the money spent to prevent and find defects (costs of conformance) plus the money lost because defects happened (costs of nonconformance).

CategoryTypeWhat it coversExamples
PreventionConformanceEffort to stop defects being madeTraining, design reviews, work instructions, standards, process documentation, coaching a vendor on the required method
AppraisalConformanceEffort to evaluate whether work meets requirementsInspections, testing, audits of output, maintaining test equipment so its readings can be trusted
Internal failureNonconformanceDefects found before the customer has the productRework, scrap, repeating a test after a fix, delays caused by defects
External failureNonconformanceDefects found by the customerWarranty repairs, field fixes, support calls, recalls, lost business and reputation

A useful way to classify an item: ask whether it stops a defect being made (prevention), looks for defects (appraisal), or is caused by a defect, and then whether the customer had the product when the defect surfaced (external) or not (internal).

The categories behave very differently. A defect costs more the later it is found, and external failures are usually the most expensive, so the reliable way to lower the total CoQ is to move effort toward prevention and earlier detection. Responses that only handle failures more efficiently, that find defects later, or that save on prevention and appraisal by accepting more failures leave the total cost of quality the same or higher.

More quality spending is not automatically better. CoQ aims for the economic level of conformance, where spending more on prevention or appraisal no longer saves more in failures. Any proposal to add a quality activity is weighed the same way: compare its cost with the failure cost it is expected to avoid, using evidence such as defect history and the consequence of a failure, and decide or escalate on that basis rather than on instinct in either direction.

For the PMP, the project's own quality decisions affect costs that may fall after the project ends (warranty, operations), so the project manager considers the whole life of the deliverable, not only the project budget.

Sustainability as part of quality

Sustainability in quality management means turning environmental and social commitments into measurable requirements for the deliverables, so that design, testing and acceptance can check them like any other requirement. A commitment that is only stated as an aspiration, delegated to others' policies, or measured only after delivery is not yet a quality requirement of the deliverable.

Examples of sustainability criteria include a cap on a building's annual energy use, a minimum share of recycled material, a carbon intensity per unit, or waste and packaging targets. Each needs a target, a tolerance and a point at which it is verified.

Once approved, a sustainability criterion behaves like every other quality requirement:

  • It changes only through change control. A cheaper, faster alternative that meets the technical specification but not the sustainability criterion, for example packaging that protects the product equally well but is not recyclable, is a proposed change to a requirement. It goes through change control with the customer involved; a purchasing or schedule argument alone does not replace it, and compensating for it somewhere else still changes the requirement.
  • Missing it is a nonconformance. A deliverable that passes its functional tests but misses an approved sustainability target does not conform. The project manager records the nonconformance and agrees the disposition formally with the customer through governance: correct it, accept it under a documented waiver or concession, or agree a later fix. Disposition is not the project team's to decide alone, whether by ignoring the miss, adjusting the target or acting unilaterally on the schedule.

Sustainability also feeds cost of quality thinking: designing for lower energy or material use is a prevention decision whose savings appear over the deliverable's operating life.

Ongoing quality reviews, audits and built-in quality

Ongoing quality reviews are the planned, recurring checks that confirm quality is being achieved throughout delivery, not just at the end: quality audits, process analysis, peer reviews, inspections and tests, design reviews, iteration reviews and retrospectives.

A quality audit is a structured, independent review of whether project activities follow the organization's and project's policies, processes and procedures. Its purpose is to:

  • identify good and best practices being used;
  • identify nonconformities, gaps and shortcomings between practice and the agreed process;
  • share good practices with other teams and projects;
  • proactively help the team improve its processes; and
  • contribute to the organization's lessons learned.

An audit examines processes. Accepting deliverables (scope validation), checking individual outputs against specification (quality control) and approving changes (change control) are other processes' jobs.

Act on process findings even when no defects have appeared. A finding that a planned control has not been operating is a process gap in itself; the lack of visible defects only means the gap has not yet been costly. The project manager works with the team to understand why the control lapsed and to restore it. Checking past output can be a sensible extra step, but on its own it leaves the process gap open, and dropping the control formally is a plan change that needs analysis and approval.

In agile work, the iteration review shows stakeholders the increment and gets their feedback, and the retrospective reviews how the team works. Stakeholder satisfaction at reviews does not prove quality: if a quality measure such as escaped defects, failed builds or support tickets is getting worse, that trend is brought to the retrospective so the team can find why it is happening before choosing a fix.

Built-in quality in agile and hybrid delivery

Built-in quality means each increment is verified as it is built, so defects are found close to when they are introduced instead of in a test phase at the end. Agile teams build quality in through practices such as:

  • Automated regression tests run on every code integration (continuous integration), giving feedback within minutes of a change.
  • Peer review or pair programming on each change before it is merged.
  • Test-first practices such as test-driven development and acceptance-test-driven development.
  • A definition of done that every item must meet before it counts as complete.

Any arrangement that moves verification later or behind a hand-off, however it is named, keeps the gap between making a defect and finding it, which is the gap built-in quality exists to close.

Definition of done versus acceptance criteria. Acceptance criteria are specific to one story; the definition of done is a shared standard that applies to every item.

Acceptance criteriaDefinition of done
ScopeOne backlog itemEvery backlog item (and often the increment)
OwnerProduct owner, with the teamThe team, within organizational standards
Example"A user can reset a password by email link""Code reviewed, tests automated and passing, accessibility checked"

A quality need that applies to every item, such as an accessibility check or the release documentation operations require, belongs in the definition of done, where it is stated once and applied consistently.

Hold the definition of done under pressure. An item that does not meet the definition of done is not done, however close it is. Reporting it as done hides technical debt and misleads stakeholders; stretching the timebox or relaxing the standard for individual items erodes the very thing that makes "done" trustworthy. A servant leader keeps the standard, shows stakeholders the real state of the work, and lets the team plan the remaining work.

Continuous improvement and root cause analysis

Continuous improvement is the ongoing, incremental improvement of products and processes during the project, based on measured evidence, rather than waiting for a lessons learned report at closure. The classic model is the Plan-Do-Check-Act (PDCA) cycle, defined by Walter Shewhart and modified and popularised by W. Edwards Deming: plan a change, try it on a small scale, check its effect against a baseline, then act by adopting, adjusting or abandoning it. Retrospectives, Kaizen and Lean practices apply the same idea.

Good improvement work has a few consistent features:

  • Small and measured. A team that has many improvement ideas picks a small number to try, and agrees in advance how it will tell whether each one worked. Changing many things at once hides which change caused which effect. Team-level experiments within the team's own way of working are the team's to run; routing each one through senior approval slows the cycle without adding evidence.
  • Evidence before wide adoption. A change that would affect several teams or a shared process is first tried on a limited scale, such as one team or one site, and measured against a baseline. The pilot produces the evidence; the formal decision to adopt it more widely, and any change to approved plans, still goes through the agreed approval route.
  • Applied during the project. A lesson learned early is applied to the remaining work, not just recorded for the next project. In a predictive project, if applying it alters the approved quality management plan (a new review step, checklist or inspection), the change is approved first and then applied from the next phase or work package.

Root cause analysis comes before fixing recurring problems. Fixing each occurrence as it appears treats symptoms, and adding extra layers of checking or slowing the work down treats them more expensively. Analysing why the problem keeps occurring usually points to a change in the process itself, often an automated or designed-in safeguard that stops recurrence without costing delivery speed. Use a cause-and-effect diagram to explore many possible causes of one problem, and five whys to drill one failure down to a process cause the team can change.

Tip. Quality items are mostly situational: a short predictive, agile or hybrid scenario, then what the project manager should do, do next, or which tool, document or cost category applies; several are Select TWO, and some give data such as a target and tolerance or a description of a control chart. A stated detail usually decides between workable options, such as whether the problem is the process or a single output, whether a control-chart signal is inside or outside the control limits and the specification, whether a requirement is already approved, whether a need applies to every story, or a constraint like least rework or no slower release cadence. Expect to tell near-twins apart: quality versus grade, prevention versus appraisal, internal versus external failure, manage versus control quality, Pareto chart versus cause-and-effect diagram, check sheet versus Pareto chart, five whys versus fishbone, scatter diagram versus histogram, control limits versus specification limits, and definition of done versus acceptance criteria.

Key takeaways
  • Quality is meeting requirements; grade is the feature level. Low grade can be acceptable, low quality never is, and lowering grade is how to cut cost without cutting quality.
  • Gather quality requirements during planning, from every user group, regulations and standards, not only from functional acceptance criteria.
  • A quality metric has a target and a tolerance and reflects what the customer values; anything inside the tolerance conforms.
  • Execute the approved quality management plan; skipping or replacing a quality activity is a change that needs approval. A hybrid project tailors one plan per approach.
  • Manage quality examines the process (audits, process analysis); control quality examines the output (inspection, testing). Recurring defects call for process work, not more inspection.
  • Control limits describe the process, specification limits describe the requirement. Investigate a point outside the control limits or seven in a row on one side; improve a stable process that is not capable; never tamper.
  • Cost of quality: prevention and appraisal are conformance, internal and external failure are nonconformance. Shift effort toward prevention, but only to the economic level.
  • Identify regulations early, build compliance checks into the definition of done, and keep documented evidence as the work is done.
  • Sustainability criteria are measurable quality requirements: they change only through change control, and missing one is a nonconformance to resolve formally.
  • Improve continuously during the project: root cause analysis before fixes, small measured PDCA trials, and lessons applied to the remaining work.

Frequently asked questions

What is the difference between quality and grade?

Quality is the degree to which a deliverable meets its requirements. Grade is the category or level of features it has. A basic product with fewer features that meets every requirement without defects is low grade but acceptable quality, while a feature-rich product with many defects is high grade but low quality. Lowering grade can be a valid way to save money; lowering quality is not.

What are the four categories of cost of quality?

Cost of quality has four categories. Prevention costs (training, design reviews, standards, work instructions) and appraisal costs (inspection, testing, calibration) are costs of conformance. Internal failure costs (rework and scrap found before delivery) and external failure costs (warranty repairs, support, recalls and lost business after delivery) are costs of nonconformance. External failures are usually the most expensive, so effort is shifted toward prevention.

What is the difference between manage quality and control quality?

Manage quality examines the processes that produce deliverables, through quality audits, process analysis and design for quality, to make sure they will produce conforming work. It is often called quality assurance, but it is broader, because it also covers designing quality in and improving processes. Control quality examines the finished deliverables, through inspection and testing against requirements and metrics, to find defects. Managing quality prevents defects; controlling quality detects them.

What is the difference between control limits and specification limits?

Control limits are calculated from a process's own data, usually three standard deviations from the mean, and show whether the process is stable. Specification limits come from the customer's requirements and show whether a unit is acceptable. A point outside the control limits signals a process problem even if the unit is within specification, and a stable process whose natural variation is wider than the specification is in control but not capable.

What is the rule of seven on a control chart?

The rule of seven says that seven or more consecutive points on the same side of the mean are unlikely to be random, even when every point is inside the control limits. It indicates that the process has probably shifted, so the project team investigates for an assignable cause rather than taking no action.

What does a quality audit produce?

A quality audit is a structured, independent review of whether project activities follow the agreed policies, processes and procedures. It identifies good practices being used and the gaps or nonconformities between practice and process, shares good practices with other teams and projects, and contributes to lessons learned. It does not provide customer acceptance or inspect individual deliverables.

When should a team use a Pareto chart, a cause-and-effect diagram or five whys?

A Pareto chart ranks many defect categories by frequency so the team can focus on the few that cause most problems. A cause-and-effect (fishbone) diagram explores the many possible causes of one chosen problem across categories such as people, process and tools. Five whys traces one specific failure through a chain of reasons until it reaches a process cause the team can change.

How do agile teams build quality into their work?

Agile teams build quality in by verifying each change as it is made rather than in a test phase at the end: automated regression tests on every integration, peer review or pair programming before merging, test-first practices, and a definition of done that every item must meet. Quality needs that apply to every item, such as accessibility or compliance checks, belong in the definition of done, and retrospectives drive continuous improvement.

Source

This lesson covers the "Process" domain of the official PMP exam guide. Vendors revise their guides — check the source for the current version.

Test yourself on this topic
PMP Process practice questions, with full explanations.
Practice now

Sign up free to mark lessons complete, bookmark topics and track your exam readiness.

Spotted a mistake in this lesson?