Information Systems Auditing Process
18% of the examCISA Audit Planning: Standards, Ethics, Risk-Based Planning and Controls
- The audit charter sets the internal audit function's authority and access and is approved by the board or audit committee; an engagement letter sets the terms of one engagement.
- ITAF standards are mandatory; departing from a guideline is allowed if you can justify it and still meet the standard.
- Audit criteria must be suitable: currently in force, independent of the subject being audited and grounded in the organization's own requirements or a recognized standard.
- Report suspected irregularities to a level above those involved; if senior management is implicated, go to the audit committee.
- Disclose any independence impairment before the work starts; auditors recommend controls, management implements them.
- A risk-based plan starts with a risk assessment of the audit universe, covers whether systems provide value as well as whether they are protected and controlled, and is revised with committee approval when risk changes.
- Auditors set scope on risk; any exclusion is judged on the risk it leaves, documented, and reported as a scope limitation where it limits the conclusion.
- High inherent or control risk means lower acceptable detection risk and more substantive testing.
- IS materiality depends on what relies on the control and on cumulative effect, not on the system's cost.
- Prefer preventive controls; test a compensating control's design and operation before relying on it, and rely on automated controls only when IT general controls are effective.
How the exam tests this
Questions on this topic take the IS auditor's point of view and examine judgement within the planning stage: which document grants the audit function's authority and who approves it, how ITAF standards and guidelines bind practitioners, what makes audit criteria suitable, how the Code of Professional Ethics and the independence requirements apply to real assignments, and where advice ends and management's implementation begins. Items also examine choosing between audits, assessments, reviews, control self-assessment and SOC report types, how a risk-based plan is built and revised and who approves it, how an engagement is planned and scoped, how the audit risk components drive the extent of testing, how materiality is judged in IS work, and how controls are classified, compensated and relied on through IT general controls. Many items use BEST, FIRST, MOST or PRIMARY qualifiers where more than one option is a real practice, so they test the order of planning steps and each party's responsibilities as well as definitions.
CISA Audit Execution: Sampling, Evidence, Data Analytics, Reporting and Follow-up
- Scope changes and delays go to audit management (and the sponsor) to be assessed and approved; never extend scope or cut procedures silently.
- A failed key control means no reliance: expand substantive testing. An effective control lets the auditor reduce substantive testing in the area it covers.
- Attribute sampling estimates a rate, variable sampling a value; discovery sampling finds a rare event, and stop-or-go keeps a sample minimal when errors are rare.
- Sample size rises with confidence and expected error, falls as tolerable error rises, and barely moves with population size once the population is large.
- Overreliance (accepting an ineffective control) threatens effectiveness and is the greater concern. Non-sampling risk is reduced by supervision and guidance, not by bigger samples.
- Evidence is most reliable when it is independent, obtained directly by the auditor, documentary and covers the period; reperformance is the strongest test of operation.
- Reconcile extracted data to the source and run CAATs under auditor control with read-only access. Full-population tests remove sampling risk only, and only for what the logic checks.
- Try alternative procedures before declaring a scope limitation; report an unresolved limitation to the audit committee and in the report.
- Fraud indicators go promptly to management above those involved; the auditor does not confront, investigate alone or act as management.
- Supported findings are reported despite disagreement, corrected issues are reported with the corrective action, and follow-up tests evidence and checks that any risk acceptance was made by someone with authority.
How the exam tests this
Questions on this topic take the IS auditor's view during fieldwork, reporting and follow-up: what the auditor should do next, which evidence or technique is best, and who should be told. Expect FIRST, NEXT, BEST, MOST and PRIMARY qualifiers where several actions are reasonable and the item turns on order, on the right party, or on the auditor's role as opposed to management's. Near-twins are common: compliance versus substantive testing, attribute versus variable sampling, discovery versus stop-or-go, sampling versus non-sampling risk, overreliance versus underreliance, observation versus reperformance, snapshot versus SCARF versus ITF, and condition versus criteria versus cause. Some items change one sampling parameter and ask the effect on sample size. Scenarios cover restricted access to evidence, possible irregularities, disagreements over findings, and follow-up of agreed actions.
Governance and Management of IT
18% of the examCISA IT Governance: Strategy, Committees, Policies and Enterprise Architecture
- Governance (the board) sets direction and risk appetite and monitors value and risk; management plans, builds and runs IT within that direction.
- Board reporting must show value realized and risk against appetite rather than operational service metrics, and it must reach the board itself.
- IT strategy committee: board level, advises on direction and value. IT steering committee: executive level, business-represented, prioritizes and monitors projects.
- The best evidence of IT–business alignment is each major initiative traced to a business objective with a business sponsor.
- Never combine development with production migration; when duties cannot be split, add independent review of activity logs as a compensating control.
- Fix reporting-line bias with business-wide prioritization and an independent security reporting line, never by moving security under internal audit.
- Policies state intent and need senior approval; standards hold specific mandatory values; procedures give steps; guidelines are optional. Effectiveness is proven by tested practice.
- Deviations need documented exceptions accepted by the accountable owner, with compensating controls and an expiry or re-review date.
- Identify legal and contractual requirements first (with legal counsel), then turn them into policies and controls; ISO certification is not proof of legal compliance, and PCI DSS binds by contract.
- Enterprise architecture needs a target state and roadmap; make architecture review a gate before acquisitions, and govern new technology by assessing risk, setting policy and naming an accountable owner.
How the exam tests this
Questions on this topic take the IS auditor's view: what the auditor should evaluate, conclude or recommend, never doing management's job (writing the policy, choosing the platform, accepting the risk). Expect BEST, MOST, GREATEST, PRIMARY and FIRST qualifiers where several options are defensible and the item turns on root cause, the right party or the right order: identify requirements before choosing controls, evaluate a gap before reporting it, prefer a preventive gate to a periodic detective review. Near-twins are common: strategy committee versus steering committee, policy versus standard, governance metrics versus operational metrics, top-down versus bottom-up policy development, certification versus legal compliance. Scenarios usually describe an organization with a structural or process weakness, such as a conflict of interest, a missing or misplaced body or document, a break between identifying a requirement and acting on it, or a technology adopted ahead of its governance, and ask for the most significant risk or the best next step.
CISA Enterprise Risk Management, Privacy and Data Governance
- A board-approved risk appetite is the reference point for every risk decision; without it, no acceptance or priority can be judged.
- IT risk must be rated on the enterprise's common criteria so it can be aggregated and prioritized with every other risk.
- Risk owners are accountable business managers; IT and control owners operate controls but do not own business risk.
- Risk above appetite must be escalated to the level the delegation scheme reserves for it, typically the board or its risk committee, and related acceptances must be aggregated.
- Compare appetite with residual risk under controls that actually operate; a control not working as assumed understates the residual rating.
- ALE = asset value × exposure factor × ARO; a control is justified when the ALE it removes exceeds its annual cost.
- Insurance transfers financial loss only; avoidance (stopping the activity) is often the best response when the activity is worth less than its risk.
- Privacy governs proper use of personal data; test actual processing against purposes and consents for the best evidence it works.
- Do a privacy impact assessment before high-risk processing is built and update it when processing changes; confirm a cross-border transfer is lawful before assessing the provider.
- Data owners classify and approve access before it is granted; inventory and owners come before enforcement, and handling rules must meet the strictest applicable requirement.
How the exam tests this
Questions on this topic take the IS auditor's view: evaluate, conclude or recommend, never set the appetite, own a risk, accept it or fix the flaw yourself. Expect GREATEST concern, MOST significant, BEST evidence and FIRST qualifiers. Typical scenarios describe a risk decision made by the wrong party or against the wrong reference (an acceptance below the required level, separate acceptances never aggregated, a residual rating resting on a control that is not operating, appetite compared with planned controls), a risk response that overstates what it achieves, or ALE arithmetic where the control's annual cost must be compared with the expected annual loss rather than one loss or the asset value. On privacy and data, items ask which principle a described practice breaks, what must happen before high-risk processing or a cross-border transfer, which evidence proves a privacy program operates rather than merely exists, who classifies data and approves access, what comes after a classification policy is approved, and how retention and erasure obligations are reconciled. Distractors are usually real controls that are detective rather than preventive, too late, owned by the wrong party or address security when the question is lawful use.
CISA IT Management: Resources, Vendors, KPIs and Quality
- Alignment of IT investment is best evidenced by an enterprise-wide portfolio process that ranks every proposal on its business case and strategic fit; benefits realization checks the promised value after go-live.
- Mandatory leave with someone else doing the duties detects fraud; prompt access removal at termination is the main personnel access risk; a practised second person removes key-person dependency.
- Outsourcing transfers the work, never the accountability; a contractual duty the organization cannot verify is not a control.
- Vendor evaluation criteria are fixed before proposals are opened, due diligence is matched to the risk, and the procurement process itself should prevent signature before review.
- A right-to-audit clause is the only term that allows direct verification; for multi-tenant SaaS, exit terms for the organization's data matter more than source code escrow.
- SOC 2 Type II tests operating effectiveness over a period, Type I covers design at a point in time and SOC 3 is a general-use summary; a bridge letter covers a time gap, not a control gap.
- The client must operate its complementary user entity controls to rely on a report, and a carve-out leaves subservice controls untested, so assurance must come from elsewhere.
- Provider-produced SLA reports are checked against the organization's own records; service credits compensate for shortfalls but do not correct them.
- KPIs measure achieved performance; KRIs warn early of rising exposure and need thresholds, owners and required responses.
- QA reviews the process and must be independent of what it reviews; QC tests the product. Maturity improvement starts with a baseline and sets per-process targets by business value and risk.
How the exam tests this
Questions on this topic take the IS auditor's view: evaluate, conclude or recommend, rather than taking management decisions such as approving a contract or running a process. Expect BEST evidence, GREATEST concern, MOST important and FIRST qualifiers. Scenarios span the four parts of section 2B: how IT investments and people are managed, how vendors are selected, contracted, assured and monitored (including SOC reports and supply chains), how performance and risk indicators are defined, reported and acted on, and how quality assurance and maturity programmes are organized. Distractors are usually sound practices that act too late, address a different risk, take a management decision, or leave the root cause in place.
Information Systems Acquisition, Development and Implementation
12% of the examCISA Systems Acquisition and Development: Project Governance, Business Cases, SDLC Methods and Control Design
- The sponsor owns the business case, funding, benefits and acceptance; a business-led steering committee directs; the project manager delivers.
- The IS auditor advises early and reviews at gates, but never designs, approves or owns the controls they will later audit.
- Every scope change needs a request, an impact assessment covering cost, schedule and benefits, and approval at the right level before it is built.
- Progress is the earned value of completed work, not budget or hours consumed; a slip on the critical path moves the end date, a slip within float does not.
- A business case needs alternatives (including doing nothing), whole-life costs and measurable benefits with an owner, and is revalidated when costs, scope or benefits change materially.
- Sunk costs never justify continuing; compare remaining costs with the benefits still achievable.
- Compare options on total cost of ownership and NPV; payback shows how fast money returns, not how much value is created.
- Feasibility is technical, economic, operational, schedule and legal; skipping operational feasibility risks a system the business never adopts.
- Pick the methodology that fits requirement stability, delivery timing and sign-off needs; in agile, controls live in acceptance criteria and the definition of done.
- Controls are cheapest at requirements and design: put them in the RFP when buying, trace every requirement to design and test, and prefer preventive designs such as segregated roles.
How the exam tests this
Questions on this topic take the IS auditor's view of a project: what the auditor should evaluate, conclude or recommend, rather than what the project team or sponsor should do themselves. Expect BEST, MOST, GREATEST, PRIMARILY and FIRST qualifiers where several options are defensible, so the item turns on the right party, the right point in the life cycle or the right kind of control. Near-twin concepts are common: the feasibility dimensions, the financial appraisal measures, input versus effort versus earned-value evidence of progress, the batch totals and edit checks, and the development methodologies. Scenarios describe a project with a weakness in its governance, its justification, its change handling, its requirements or its control design and ask for the greatest risk or the best recommendation. A few items need short schedule or financial reasoning.
CISA Information Systems Implementation: Testing, Release, Changeover, Data Conversion and Post-implementation Review
- Test levels run unit → integration → system → acceptance, and each should be stable before the next begins.
- Load testing works at the expected peak, stress testing goes beyond it to the breaking point, volume testing uses large data quantities, recovery testing checks restart.
- Regression testing reruns previously passed tests with the same data after a change; impact analysis selects them when the full suite cannot fit.
- Approval for production rests on user acceptance testing designed from business criteria and signed off by the business owner, not on vendor or IT testing.
- Mask or substitute sensitive production data before it reaches test, using substitutes that keep the format and validity the tests need.
- Open defects at go-live are acceptable only when the accountable owner formally accepts the risk with compensating controls; the auditor ensures this, not decides it.
- Certification is the technical security evaluation; accreditation is senior management's authorization to operate and acceptance of residual risk.
- An independent group promotes approved, baselined releases from a controlled library, and a hash check proves the deployed build is the accepted one.
- Parallel changeover is lowest risk and highest effort; direct cutover is highest risk and needs go/no-go criteria and a rehearsed fallback.
- Counts and totals prove conversion completeness; only record-level reconciliation catches swapped values; the business data owner signs off; a PIR waits until results are measurable.
How the exam tests this
Questions on this topic take the IS auditor's view of implementation: what the auditor should evaluate, conclude or recommend about readiness, release, migration and the post-implementation review, rather than fixing problems or making the go-live decision. Expect BEST, MOST, GREATEST, PRIMARILY, ROOT cause and FIRST qualifiers where several options are defensible, so the item turns on the right party, the right timing, preventive over detective controls, or evidence of capability over evidence of approval. Near-twin terms are tested directly: the test levels, load versus stress versus volume testing, regression testing, the changeover methods, certification versus accreditation, and counts versus totals versus record-level reconciliation. Scenarios are set close to go-live or shortly after it, and often add a business constraint that rules out the textbook answer.
Information Systems Operations and Business Resilience
26% of the examCISA IT Operations: Components, Asset Management, Job Scheduling, Interfaces and End-User Computing
- An accurate asset inventory comes first; every asset needs an owner accountable for its protection and retirement.
- Completeness is tested from discovered devices to the register; existence from the register to the device. A fixed-asset ledger omits expensed devices.
- License compliance compares usage with entitlements on the licensed metric: installations, named users or peak concurrent use.
- Anything leaving with storage is a disposal: purge SSDs with sanitize or cryptographic erase, retain failed warranty drives, and reconcile per-serial certificates.
- Schedulers reduce operator error but shift risk to job definitions; link dependent jobs by condition and derive parameters from the calendar.
- Sample schedule changes from the scheduler's audit log to approvals; ad hoc jobs need approval before they run; emergency access needs a review independent of development.
- Record counts prove records arrived; control totals prove values survived; rejected records need a suspense queue, not an overwritten error file.
- Rank EUC by output impact and logic complexity; the strongest compensating control reconciles results to source data; shadow IT is found through expense and proxy or CASB data and governed by risk assessment, not blanket bans.
How the exam tests this
Items on this topic are written from the IS auditor's chair: what evidence to gather next, which test answers a given assertion, which control best prevents a stated problem, or what the greatest concern is in a described setup. Expect scenarios on asset registers (completeness or existence), license reviews under different license models, disposal of drives and leased devices, scheduler changes, ad hoc jobs and abends, emergency access reviews, interface reconciliations and spreadsheets used in financial reporting. Several options are usually defensible; the item turns on test direction, preventive over detective controls, operating over design evidence, and acting on evidence before recommending.
CISA IT Service Operations: Availability, Incident, Problem, Change, Patch, Log, Service Level and Database Management
- Capacity management plans for peaks and forecast business demand; annual averages and historical trends alone hide the risk.
- Availability = MTBF / (MTBF + MTTR): improve whichever factor is weak; redundancy raises service availability by masking component failures.
- Incident management restores service fast; problem management removes causes, keeps known errors open until a permanent fix and is measured by fewer repeat incidents.
- Prioritize incidents by impact and urgency, escalate functionally and hierarchically by defined rules, and close only on confirmed resolution.
- Emergency changes are acceptable when approved after the fact within a defined period; recurring emergency changes to the same component signal bypassed change control.
- Only an independent group should update production; emergency IDs need full logging and independent review after each use.
- To find unauthorized changes, start from production and trace back to approved records; to test recorded changes, sample the tickets.
- Patch deadlines should follow severity and exposure; unpatchable systems need isolation, monitoring, a risk-owner-approved time-limited exception and a retirement plan.
- Trustworthy logs are centrally protected from the people logged, time-synchronized, detailed enough for their purpose, retained per legal needs and reviewed independently.
- SLAs need supporting OLAs and underpinning contracts, end-to-end user metrics and validation against the organization's own data; DBAs need named accounts, data-owner authorization and independent review.
How the exam tests this
Questions on this topic take the IS auditor's view of IT service operations: what the auditor should evaluate, conclude, test first or recommend about capacity, incidents, problems, changes, configuration, patches, logs, service levels and databases, rather than fixing the issue personally or making management's decision. Scenarios turn on choosing the right process (incident versus problem, capacity versus availability), the right party (independent reviewer, risk owner, data owner), preventive versus detective controls, and the strength of audit evidence. Closely related terms are examined directly, such as MTBF and MTTR, entity and referential integrity, SLA and OLA, and the population an auditor samples to test change controls. Harder scenarios give several facts that only lead to a conclusion when read together.
CISA Business Resilience: BIA, Backup and Restoration, Business Continuity and Disaster Recovery Plans
- The BIA ranks processes by the impact of their loss over time; business owners validate it, and it comes before any recovery strategy.
- RPO limits data loss and drives backup frequency and copy location; RTO limits restore time and must not exceed the maximum tolerable downtime.
- An RPO is met for a scenario only if a recent enough copy survives that scenario, so local backups do not cover loss of the site.
- Size each recovery strategy where the combined cost of disruption and recovery is lowest; a cold site or reciprocal agreement is only as reliable as the equipment and capacity behind it.
- RAID, clustering and replication provide availability; only point-in-time backups kept elsewhere recover from deletion, corruption, ransomware or site loss.
- Differential restores need the full plus one set; incremental restores need the full plus every incremental since.
- Keep at least one backup copy off-site at a safe distance and one offline or immutable, and keep encryption keys recoverable away from the primary site.
- A validated restore to a test environment is the best evidence that backups work; job-success logs are not.
- Plans put life safety first, define who may declare a disaster and when, and restore critical systems together with their dependencies.
- Test from checklist and walk-through up to parallel and full interruption; judge tests on realistic conditions, documented procedures and tracked remediation.
How the exam tests this
Questions on this topic take the IS auditor's view of business resilience: what the auditor should conclude, check first, rely on as evidence or recommend about the BIA, recovery objectives and strategies, system resilience, backups and restoration, and continuity and recovery plans and their tests, rather than running the recovery or taking management's decisions. Many items turn on near-twin terms (RPO and RTO, RTO and maximum tolerable downtime, incremental and differential backups, hot, warm and cold sites, walk-through, parallel and full interruption tests, SOC 1 and SOC 2) and on the strength of evidence, such as restore results versus job logs. Harder scenarios give several facts that only reveal the risk when read together, for example where recoverable copies sit relative to the event an objective covers, what a test skipped, or what a provider's assurance report leaves out of scope.
Protection of Information Assets
26% of the examCISA Information Asset Security: Frameworks, Physical and Environmental Controls, Identity and Access, Network Security and DLP
- Policies set direction, standards make it mandatory and measurable, procedures give the steps and guidelines are optional advice; deviations need a formal, risk-accepted, time-limited exception.
- Only ISO/IEC 27001 is a certifiable ISMS requirements standard; 27002 is control guidance, and NIST CSF and COBIT offer no ISMS certification.
- The data owner classifies data and authorizes access; custodians and security administrators implement; the IS auditor never approves access.
- Mantraps prevent tailgating, visitors in a data center are escorted throughout, and a finding of access that should no longer exist is rated by first checking whether it was used.
- Pre-action sprinklers minimize accidental water discharge, clean agents leave no residue, CO2 needs an alarm and delay, and life safety always outranks equipment.
- A UPS bridges short disturbances until the generator takes over, and a generator that has never carried full load leaves the power design unproven.
- HR events should drive joiner, mover and leaver changes; contractors outside HR are the usual gap, and leaver tests sample from the complete HR population.
- Recertification by business owners works only when reports are understandable; re-perform a sample when approvals look rubber-stamped.
- MFA needs different factor types, SSO concentrates risk in the identity provider, and privileged access needs named accounts, tamper-proof logs and independent review.
- Use screened subnets, segmentation and default-deny rule bases; a WAF stops application-layer attacks; NAC adds posture checks; test coverage and enforcement directly; and build DLP by classifying data first, then tuning before blocking.
How the exam tests this
Questions on this topic take the IS auditor's view of information asset security: what the auditor should evaluate, test, conclude or recommend about security frameworks and policy documents, data ownership and classification, physical and environmental controls, identity and access management, authentication, privileged access, network and endpoint security and data loss prevention. The auditor evaluates and recommends and never grants access or fixes the issue personally. The domain assesses whether candidates can tell preventive from detective controls, root causes from symptoms, the accountable party from the implementing one, and design from operating effectiveness, and whether they can judge the strength of audit evidence, including the completeness of the population tested. Candidates are also expected to distinguish closely related terms and technologies across these areas.
CISA Encryption, PKI, Cloud, Virtualization, Mobile and IoT Security
- Use symmetric ciphers for bulk data and public key methods to deliver the symmetric key; encrypt to the recipient's public key for confidentiality and sign with the sender's private key for nonrepudiation.
- A hash detects change only if its reference copy is protected; a MAC adds a shared key; only a digital signature, with a key one party alone holds, gives nonrepudiation.
- Key management is where encryption fails: keys stored beside the data, or one person holding both data and key access, defeat any algorithm.
- Escrow encryption keys so data stays recoverable, but never keep copies of signing private keys.
- TLS protects only the session; TDE does not stop DBAs; full-disk encryption with pre-boot authentication protects lost devices; destroying customer-controlled keys is the strongest cloud sanitization evidence.
- Rely on a CA through its practice statement and audits; keep the root offline; revoke first when a private key is compromised; online status checks close the CRL freshness gap.
- Cloud responsibility for operating controls follows the service model, but accountability for the data stays with its owner; test CUECs yourself and get separate assurance for carved-out subservice organizations.
- Hypervisor console compromise has the widest impact; traffic between guests on the same virtual switch is invisible to physical-network IDS; production snapshots need the protection of the data inside them.
- MDM with containers, selective wipe and continuous compliance protects mobile data; test coverage from the population that actually connects.
- Use 802.1X with server certificate validation, isolate guest traffic and hunt rogue access points; for IoT, inventory first, remove default credentials and segment what cannot be patched.
How the exam tests this
Questions on this topic are written from the IS auditor's chair: which control best protects data in a described situation, what the greatest remaining risk is after a partial control, what to recommend or do first, and which evidence is most reliable. Expect scenarios on choosing and combining encryption techniques, hashes versus MACs versus signatures, key storage and segregation, escrow, TDE and staging folders, PKI design and revocation, cloud service models, SOC 2 reports with user entity controls or carve-outs, cloud contract clauses, hypervisor and snapshot exposure, BYOD containers and compliance, enterprise wireless, rogue and guest networks, and IoT devices with default credentials or no patches. Several options are usually defensible; the item turns on which one addresses the root cause or the stated constraint, preventive over detective, and the auditor's role.
CISA Security Event Management: Awareness, Attacks, Testing, Monitoring, Incident Response and Forensics
- Judge awareness programs by behaviour (trended phishing click and report rates with varied lures), not completion or quiz scores; train everyone, contractors included, before access
- Social engineering is stopped by out-of-band verification using contact details already on record, and push fatigue by number matching or phishing-resistant MFA
- Root-cause fixes: parameterized queries for SQL injection, output encoding for XSS, session-bound anti-forgery tokens for CSRF
- Volumetric DDoS must be filtered upstream; ransomware with data theft is also a breach that needs a notification assessment
- Scans list potential weaknesses (credentialed scans see more, false positives must be verified); penetration tests show exploitability but never prove absence
- Penetration tests need written authorization, scope and rules of engagement first; double-blind tests the response team, targeted tests are efficient, internal tests show lateral movement
- A SIEM is only as good as its log sources, synchronized clocks and tuned, risk-ranked alerts; run a new IPS in detect-only mode and tune before blocking
- Incident response: contain first, preserve evidence before rebuilding; an auditor who finds an intrusion escalates to management rather than acting
- Severity criteria must include data sensitivity, and notification decisions run during the investigation; track MTTD/MTTC and lessons-learned actions to closure
- Forensics: unbroken chain of custody, most volatile first, bit-stream image through a write blocker, hash original and image, analyse copies only, legal hold to stop deletion
How the exam tests this
Questions on this topic are written from the IS auditor's chair: what is the best evidence a program or capability works, what the primary concern is in a described situation, which control best addresses an attack, and what to confirm, recommend or do first. Expect scenarios on awareness metrics and simulated phishing, training timing and coverage, pretexting, business email compromise and push fatigue, SQL injection versus XSS versus CSRF, logic bombs, ransomware with data theft and volumetric DDoS, credentialed scans and disputed false positives, penetration test authorization, cloud-hosted targets and stop criteria, blind, double-blind, targeted and internal tests, SIEM coverage, clock synchronization and alert overload, IDS detection methods, IPS rollout and honeypots, incident phases and evidence-preserving containment, the auditor discovering an intrusion, severity criteria and notification deadlines, misleading response metrics, chain of custody, order of volatility, write-blocked imaging and legal holds. Several options are usually defensible; the item turns on root cause over defence in depth, preventive over detective, sequence, and the auditor's independence.
Where these CISA facts came from
CISA cheat sheet: your questions
Source
Exam structure, domain weights and scoring on this page come from the official CISA exam guide.
- ISACA CISA Exam Content Outline — ISACA